The Ministry of Energy and Infrastructure has announced the temporary closure of Al Dhaid Road Bridge No. 7 on Emirates Road for construction works in two phases.
The first phase of closure will take place from February 14 to February 15 between 12:00 am to 8:00 am, while the second phase will run between February 16 and February 17 during the same hours overnight.
Motorists are advised to plan alternate routes during the temporary closures.
نود إفادتكم بأنه سيتم إغلاق طريق الذيد عند الجسر رقم (7) على شارع الإمارات، وذلك ابتداءً من 14/02/2026 وحتى 15/02/2026، من الساعة 12:00 صباحاً وحتى الساعة 08:00 صباحاً للمرحلة الأولى
— وزارة الطاقة والبنية التحتية (@MOEIUAE) February 12, 2026
و من 16/02/2026 وحتى 17/02/2026، من الساعة 12:00 صباحاً وحتى الساعة 08:00 صباحاً للمرحلة… pic.twitter.com/Dle84ppTMu

UAE President calls for stronger global cooperation at G7 Summit
UAE foils drug distribution plot, dismantles criminal network
Sharjah Ruler unveils AED 750 million projects to link direct roads to Dubai
UAE President meets US President on sidelines of G7 Summit
UAE President, Greek PM discuss strategic cooperation
Emirati Media Forum to address misinformation, AI and industry transformation
UAE introduces new Emiratisation rules for healthcare sector
